S/No |
Description of Project Title |
Client |
Completion Dat
|
1 | Proposed Relocation of Pontoons and Gangway and Addition of New Pontoons, Sentosa Cove | One○ 15 Marina Club | On-going |
2 | Replacement of Bridge at Sungei Buloh Wetland Reserves | National Parks Board (Npark) | On-going |
3 | Construction of Emergency Landing Facility at Marina Bay Cruise Centre | Maritime Port Authority of Singapore (MPA) | On-going |
4 | ABC Waters Project at Jurong Lake (Phase II) | Public Utilities Board (PUB) | On-going |
5 | Proposed Structural Repair for Jetty 3 and Jetty 4 at Pulau Busing Terminal | PB Tankers Ltd | On-going |
6 | Proposed Salvage Project at Vopak Banyan Jetty 6/7 at Jurong Island | Vopak Terminals Singapore Pte Ltd | On-going |
7 | Proposed Design and Build Ferry Terminal at Jurong Island (C180069T00) | Jurong Town Corporation (JTC) | On-going |
8 | Demolition / Removal of Existing Jetty with Piles & Supply & Install a New Floating Jetty and Fuel Pontoon for Qatar Armed Force, Doha | Atlantic Marine | On-going |
9 | Fabricate and Deliver of all the Structural Aluminium Frames and Timber Deck and Accessories for the Installation of the Pontoons and Gangways for Sheikh Jaber Al-Ahmad Al-Sabah Causeway Project for Ministry of Public Works Road Administration, State of Kuwait | Golden Eiwan Gen. Trading & Contracting Co | On-going |
10 | Widening of Piers, Marine Works and Ancillary Works at Changi East (D2012-00180-020) for DSTA | Expand Construction Pte Ltd | On-going |
11 | Proposed Marina Bay Sands Integrated Resorts Dev. 105 Retail Space Conversion (Package A) – Joint Venture Agreement | Marina Bay Sands Pte Ltd | On-going |
12 | Design and Build of Proposed A/A Works to Pontoon at Marina at Keppel Bay | Keppel Bay Pte Ltd | Sep-2019 |
13 | Supply, Delivery and Installation of Floating Pontoons and Piling for Phase I and II for Darren Marina, Kingdom of Saudi Arabia | Alghanim Intl GenTrading & Contracting Co. W.L.L | Jun-2019 |
14 | Design, Supply and Install Fire-Resistant Fuel Pontoon at Sentosa Cove, Singapore | One○ 15 Marina Club | May-2019 |
15 | Implementation of H/I Beam and Modifications to J Berth at RSYC | Republic of Singapore Yacht Club | May-2019 |
16 | Cleaning and Inspection of Floating Platform Including Classification Survey at Marina Bay (for 3 Year Contract) | Singapore Sports Council | Jan-2019 |
17 | Supply and Delivery of Floating Pontoons and Aluminium Beams for Fireworks at Marina Reservoir | Glorious Singapore Pte Ltd | Dec-2018 |
18 | Design and Build of Floating Pontoons and Installation of Marine Piles to Fixed Ramp for Proposed Development of Jurong Lake Gardens West | Hon Industries Pte Ltd | Oct-2018 |
19 | Chartering of Crane Barge including Crew for Proposed Upgrading of Fire Water System at Exisiting Cafhi Jetty | Fastweld Engineering Construction Pte Ltd | Aug-2018 |
20 | Rental of Floating Sea Barrier at Marina Reservoir | Singapore Police Force (SPF) | Aug-2018 |
21 | Design, Procurement of Floating Debris Boom Made of High Density PVC Floats at Corals Keppel Bay Drive | Woh Hup Holdings (Private) Limited | Jul-2018 |
22 | Repair of Damaged Pontoon / Piles at Sentosa | One⁰15 Marina Club | Jun-2018 |
23 | Proposed Upgrading Works and Construction of New Landing Facilities at West Coast Pier | Maritime & Port Authority of Singapore | Jun-2018 |
24 | Supply and Drive of Steel Piles for Proposed Pontoons at Changi Ferry Terminal for Johor Port | Benco Marine Pte Ltd | Apr-2018 |
25 | Drydocking and Maintenance of Kusu I, Kusu II, Kusu BBI and Hantu II Pontoons | Singapore Land Authority | Jan-2018 |
26 | Maintenance of Mooring and Marker Buoys at Changi Naval Base (Ref No: 9017102282) | Defence Science and Technology Agency | Dec-2017 |
27 | Design and Construction of Proposed Wave Screen at Republic of Singapore Yacht Club | Republic of Singapore Yacht Club | Nov-2017 |
28 | Supply, Deliver and Install Marine Pontoon at 9 Sentul Crescent | Safra Punggol | Sep-2017 |
29 | Design and Build of Infrastructure Works of Proposed Floating PV Test-Bed at Sungei Tengeh, Singapore | National University of Singapore c/o Solar Energy Research Institute of Singapore (SERIS) | Sep-2017 |
30 | Replacement of Fenders at Pulau Bukom | Shell Eastern Petroleum Pte Ltd | Jun-2017 |
31 | Builder Works to New Light and Water Show named “Spectra” at Marina Bay | Marina Bay Sands Pte Ltd | May-2017 |
32 | Piling Works for Phase 2 at Pulau Sebarok | GP1 Pte Ltd c/o Cleanseas | Apr-2017 |
33 | Drydocking and Maintenance of Terminal Pontoon at St John Island | Singapore Land Authority (SLA) | Mar-2017 |
34 | Proposed Rectification Works to Existing Quay No. 2 at 15 Benoi Road | Keppel Shipyard Pte Ltd | Mar-2017 |
35 | Marina and Private Berth Floating Pontoons and Associated Works at Emerald Bay, Iskandar, Johore, Malaysia | Haute Property Sdn Bhd | Dec-2016 |
36 | Proposed Demolition of Pontoon, Gangway and Piles etc at Tanah Merah Coast Road | SAF Yacht Club | Nov-2016 |
37 | Construction of a Mooring Dolphin at SAF Ferry Terminal and Installaton of Fenders at Pulau Sudong | Defence Science & Technology Agency (DSTA) | Jul-2016 |
38 | Proposed offshore Reinstatement at SPC Penjuru Terminal | Singapore Petroleum Company Limited | Jun-2016 |
39 | Design and Construction of New Reinforced Concrete Jetty with Floating Pontoon, Camp 1, Pulau Ubin | Outward Bound Singapore C/o National Youth Council | May-2016 |
40 | Repair and Refurbishment of Jetty A & B Berthing & Mooring Facilities at Tuas Power Station | Tuas Power Generation Pte Ltd | Dec-2015 |
41 | Maintenance of Mooring Buoys and Marker at Changi Naval Base | Defence Science & Technology Agency (DSTA) | Nov-2015 |
42 | Proposed Extension of RLYC Marina with New Pontoons and Marine Services | Royal Langkawi Yacht Club Berhad (RLYC) | Nov-2015 |
43 | Removal of Silt Curtains off the shore near Tuas South Avenue 3 | Public Utilities Board | Sep-2015 |
44 | Construction of Steel Pontoon in Sembawang Camp | Defence Science & Technology Agency | Sep-2015 |
45 | Construction of ACM Water Stairs and QEII Promenade Water Steps on Singapore River for Urban Redevelopment Authority | Shanghai Chong Kee and Furniture Pte Ltd | Sep-2015 |
46 | Proposed Bridge Across King’s Dock between Plots 3 & 4 on Lots 03442W & 03493T MK01 at Keppel Harbour, Keppel Bay Drive | Woh Hup Holdings (Private) Limited | Sep-2015 |
47 | Proposed replacement of damaged piles at Berth J23 at Jurong Port | Global Maritime And Port Services Pte Ltd (GMAP) | Aug-2015 |
48 | Design, Supply and Install Floating System at Ferry Terminal, Bintan, Indonesia | P.T. Bintan Resort Cakrawala | Jul-2015 |
49 | Upgrading of Fender System and Power at Pier in Tuas Naval Base and Installation of fence at Tuas View East for Ministry of Defence 2 | Defence Science & Technology Agency (DSTA) | Jun-2015 |
50 | Design, Supply and install 2x Crane Foundation at Penjuru Lighter Wharf | MORDEC International Pte Ltd | May-2015 |
51 | Design, Construction, Installation, Testing and Commissioning of Floating Platform for Phase II Development of Semakau Landfill, Singapore | National Environment Agency (NEA) | Mar-2015 |
52 | Proposed New Pedestrian Bridge at Mariana Bay at Esplanade Drive named as “Jubilee Bridge” Celebrating Singapore SG50, Singapore | Urban Redevelopment Authority (URA) | Mar-2015 |
53 | Addition and Alteration Works to Tall Ship New Pontoon at Maritime Musuem for Royal Albatross at RWS, Sentosa | Resorts World at Sentosa Pte Ltd (RWS) | Feb-2015 |
54 | Proposed Improvement Works to Infrastructure Works and Associated Facilities including Lock Gate and Floating Pontoon at Sentosa Cove, Singapore | Sentosa Development Corporation | Jan-2015 |
55 | Design, Construction, Supply and Installation of Two Replacement Beacons at Gerita Beacon and Second Bukom Beacon, Singapore | Maritime & Port Authority of Singapore (MPA) | Dec-2014 |
56 | Design, Supply and Delivery of 11 Units of Aluminium Gangways at Kuala Kedah Jetty, Langkawi | Pembinaan Ismail Sdn Bhd | Dec-2014 |
57 | Reconstruction of Seaward Infrastructure and Ancilliary Works at SAF Ferry Terminal for Ministry of Defence 2 | Defence Science & Technology Agency (DSTA) | Dec-2014 |
58 | Supply and Delivery of Floating Pontoon for Dock A at Aberdeen Marina Club, Hong Kong | Aberdeen Marina Club | Jul-2014 |
59 | Design and Build of Proposed Floating Pontoon and Permanent Slipway for Water-Venture, Marina East, Singapore | People’s Association (PA) | Jul-2014 |
60 | Propose A/A involving the Addition of Jetty 6A and 6B to the Existing Jetty 6 at Pulau Busing, Singapore | Tankstore Limited | Jul-2014 |
61 | Supply and Install of Rowing Pontoon and Water Taxi Pontoon at Singapore Sports Hub, Kallang, Singapore | Dragages Singapore Pte Ltd | Jun-2014 |
62 | Construction of New Jetty and Floating Pontoon at Pasis Ris, Singapore | Agri-Food and Veterinary Authority of Singapore (AVA) | Apr-2014 |
63 | Supply, Delivery, Installation and Relocation of Pontoon, Fingers at Sentosa Cove, Singapore | One○ 15 Marina Club | Mar-2014 |
64 | Pile-Top Drilling; Reverse Circulation Drill Rig at Karimum Jetty, Indonesia | McConnell Dowell Pte Ltd | Dec-2013 |
65 | Supply and Install of Permanent Pontoon at Punggol Waterway, Singapore | Housing and Development Board | Aug-2013 |
66 | Supply and Installation of Mooring Buoys and Marine Piling Works including Laying of Heavy Duty Mooring for Proposed Anti-Intruder Floating Barrier, Changi Naval Base, Singapore | DCNS Far East Pte Ltd | Apr-2013 |
67 | Design, Supply and Installation of Pontoon at for Shangri-La Tanjung Aru Resort at Kota Kinabalu, Malaysia | iPerdana Corporation Sdn Bhd | Dec-2012 |
68 | Maintenance of Mooring Buoys and Marker Buoys at Changi Naval Base for Republic of Singapore Navy, Singapore | Defence Science & Technology Agency (DSTA) | Nov-2012 |
69 | Supply and Installation of Jetty and Floating Pontoon at Custom Immigration Quarantine Procedures (CIQP) at Puteri Harbour for UEM Land Berhad, Nusajaya, Iskandar Johore, Malaysia | THB Star Gate Sdn Bhd | Sep-2012 |
70 | Pontoon for River Taxi and Cruise at Kuching Waterfront, Sarawak, Malaysia | Sarawak Economic Development Corporation (SEDC) | Sep-2012 |
71 | Design and Build for Completion of Internal Waterways and Water Bodies (Desiliting and Associated Work) at Sentosa, Singapore | Sentosa Development Corporation | Aug-2012 |
72 | Marine Piling and Construction of Flotsam Reception Jetty at Admiralty Road West, Singapore | Maritime & Port Authority of Singapore | Aug-2012 |
73 | Design and Build for Erection of 115m Waterfront Quay Wall c/w RC Slab and 17 x 12m Connecting Bridge for 100kPa at Penjuru Shipyard, Singapore | Mencast Offshore and Marine Pte Ltd | Aug-2012 |
74 | Construction of 3 Nos of Floating Conference Pods with Pontoon and Gangway at Fullerton Bay Hotel | Precious Quay Pte Ltd | Aug-2012 |
75 | Removal, Repair and Reinstallation of the Damaged Outer Shoal Resilient Beacon at East Keppel Fairway, Singapore | Maritime & Port Authority of Singapore | Jun-2012 |
76 | Demolition of Jetty at Sentosa Gateway, Singapore | Resorts World at Sentosa Pte Ltd (RWS) | Jun-2012 |
77 | Repairs to Damaged Berth T5 and Replacement of Piles at Tanjong Pagar Terminal, Singapore | PSA Corporation Limited | May-2012 |
78 | Marina Upgrading Works including Pontoon Piling at Sembawang, Singapore | SAF Yacht Club | May-2012 |
79 | Design, Supply & Installation of Pontoons @ Quayside Hotel at Ocean Way, Sentosa | SsangYong Engineering & Contruction Pte Ltd | Apr-2012 |
80 | Extension of Existing Slipway and Replacement of Gates at Changi Adventure Centre and Sea Sports Centre, Singapore | Ministry of Education | Jan-2012 |
81 | Construction of Floating Structures and Piling in Marina Reservoir for Completion of Floating Restaurant, Pivot Bridge, River Taxi Kiosk and Small Craft Pontoon at Collyer Quay, Singapore | Precious Quay Pte Ltd | Nov-2011 |
82 | Design, Supply and Installation of 18 Units of Private Yacht Berth at Sandy Island, Sentosa Cove | YTL Construction (Singapore) Pte Ltd | Nov-2011 |
83 | Supply and Installation of Marina Jetty at Precinct 2 at Klang, Malaysia | Glenmarie Cove Development Sdn Bhd | Oct-2011 |
84 | Design, Supply and Installation of Floating Pontoon at Maritime Xperiential Museum and Water Extraction Pipelines at Marine Life Park at Sentosa, Singapore | Resorts World at Sentosa Pte Ltd (RWS) | Aug-2011 |
85 | Design, Supply and Installation of Floating Wetlands at Mangroves and Wetlands Arboretum along Punggol Waterway, Singapore | Housing and Development Board (HDB) | Jul-2011 |
86 | Design, Supply and Installation of Boat Docks at the North Dock, South Dock and Crystal Pavilion Dock for the Integrated Resort Development at Marina Promenade, Singapore | Penta Ocean Construction Pte Ltd | Jun-2011 |
87 | Design & build of 40-berth marina including marine piling for Straits Quay Marina at Seri Tanjung Pinang | E&O Property (Penang) Sdn Bhd | Apr-2011 |
88 | Design, Supply and Installation of a 50m Waiting Pontoon and Access Gangway at the Entrance of Sentosa Cove Northen Lock | Sentosa Development Corporation | Feb-2011 |
89 | Dry-Docking and Maintenance of Three Terminal Pontoons at Southern Islands (Subar Laut – Sisters Island and Pulau Hantu Kechil), Singapore | Sentosa Development Corporation | Jan-2011 |
90 | Supply and Installation of Floating Pontoons including Marine Piling and M&E Works for Phase III at One○ 15 Marina, Sentosa Cove, Singapore | SUTL Marina Development Pte Ltd | Jan-2011 |
91 | Design, Supply and Installation of 34 Units of Boat Berth and Gangways at the Quayside Condo, Ocean Way, Sentosa Cove, Singapore | Dragages Singapore Pte Ltd | Nov-2010 |
92 | Pedestrian Bridge and Floating Boardwalk including 27,000 sq ft Floating Wetland across Sungei Punggol was opened to the Public by Guest-of-Honour, Prime Minister, Mr Lee Hsien Loong, Singapore | Public Utilities Board | Oct-2010 |
93 | Supply, Design and Installation of Floating Pontoon in Tasik Chini, Tasik Bera for Jabatan Laut (Marine Police), Pahang, Malaysia | Global Bina Sdn Bhd | Sep-2010 |
94 | Repair to Berth B04 including Extraction of Spun Piles and Reinstallation of Steel Pipes at Brani Terminal, Singaore | PSA Corporate Ltd | Aug-2010 |
95 | Design, supply and installation of Floating Pontoon including gangway for Redevelopment of Contract 31 at Kallang-Whampoa for Housing & Development Board | Ho Lee Construction Pte Ltd | Jun-2010 |
96 | Construction of Steel Bridge, RC Deck and Performance Stage at Family Bay & Rowers’ Bay at Lower Seletar Reservoir was Declared Opened by Guest-of-Honour, Prime Minister, Mr Lee Hsien Loong, Singapore | Public Utilities Board | Jun-2010 |
97 | Maintenance of Mooring Buoys and Marker Buoys including Marine Lanterns at Changi Naval Base, Singapore | Defence Science & Technology Agency | May-2010 |
98 | Construction of 15,000 DWT Feedstock Jetty at Tuas Power Station, Singapore | Tuas Power Generation Pte Ltd | Apr-2010 |
99 | Supply, Installation, Repair and Disposal of Mooring Buoys at the Pulau Punggol Aggregate Terminal, Tuas Aggregate Terminal and the ex-Pasir Ris Aggregate Terminal, Singapore | Building and Construction Authority (BCA) | Feb-2010 |
100 | Design, Supply and Installation of 21 Units of Boats and Gangways at Turquoise Island, Sentosa, Singapore | Ho Bee Cove Pte Ltd | Jan-2010 |
101 | Design, Supply and Installaion of Floating Pontoon System and Accessories at Pulau Wan Man, Kuala Terengganu | Accentsys Sdn Bhd | Oct-2009 |
102 | All Works Completed for Aluminium Pedestrian Bridge, RC Deck and Boardwalk except Floating Island Scheduled in 3rd Quarter 2010, Sungei Punggol, Singapore | Public Utilities Board | Sep-2009 |
103 | Marine Bored Piles with RCD Rigs of 54 Piles for Mooring System for Phase II Wet Berth to Marina @ Keppel Bay, Pulau Keppel, Singapore | Keppel Bay Pte Ltd | Aug-2009 |
104 | Repair Works on Damaged Piles, Gangway and Pontoons, Tuas, Singapore | Raffles Marina Ltd | May-2009 |
105 | Reconstruction of Damaged Fishing Jetty 1 at Sultan Shoal Lighthouse, Singapore | PSA Corporation Limited | May-2009 |
106 | Reconstruction of Jetty and Dolphins include Salvage of Collapsed Jetty, Demolition, Mechanical and Electrical Works at Sultan Shoal Island, Singapore | Maritime and Port Authority of Singapore (MPA) | Apr-2009 |
107 | Design, Supply and Installation of 41 Units of Boat Berths and Gangways at “The Coast” Condominium, Sentosa Cove, Singapore | Ho Bee Cove Pte Ltd | Jan-2009 |
108 | Design, Supply and Installation of 29 Units of Private Berths to Detached Dwelling Houses at Paradise Island, Sentosa Cove, Singapore | Ho Bee Homes Pte Ltd | Jan-2009 |
109 | Supply and Installation of Floating Pontoon in Kuala Perlis, Lumut; Weld Quay in Pinang for Jabatan Laut Wilayah, (Marine Police) Bases, Malaysia | Pembinaan Ismail Sdn Bhd | Dec-2008 |
110 | Supply and Installation of Floating Bar including M&E Works, Sentosa, Singapore | One○ 15 Marina Club | Dec-2008 |
111 | Supply and Installation of Sheet Piles and Capping Beams to Existing Wharf at Tuas Road shipyard, Singapore | MacGregor Plimsoll Pte Ltd | Aug-2008 |
112 | Supply and Installation of Steel Pipe Piles to Existing Jetty at Tuas shipyard, Singapore | Damen Shipyards Singapore Pte Ltd | Aug-2008 |
113 | Supply and Install the Pontoon System at Ferry Terminal and Canoe Launching Platform at Putrajaya Maritime Centre, Malaysia | IJM Corporation Bdn | Jun-2008 |
114 | Maintenance of Mooring Buoys and Markers Buoys at Changi Naval Base for Ministry of Defence, Singapore | Defence Science & Technology Agency (DSTA) | May-2008 |
115 | Concrete Repair of Existing Service Jetty at Pulau Sebarok, Singapore | Singapore Petroleum Company (SPC) | May-2008 |
116 | Design, Supply and Installation of Floating Deck, Pontoons and Adjustable Gangway to Redevelopment of MacRitchie Reservoir Park for Public Utilities Board, Singapore | Wacon Pte Ltd | Apr-2008 |
117 | Design and Construction of Floating Pontoon Deck and Linkbridges for Redevelopment to Bedok Reservoir Park for Public Utilities Board, Bedok Reservoir Road, Singapore | Lee Hong Construction Pte Ltd | Mar-2008 |
118 | Foundation Works to Existing Jetty, including Mooring Bollards and RC Works and Piles Driven for Mooring Dolphin, Pandan Road, Singapore | PPL Shipyard Pte Ltd | Jan-2008 |
119 | Design and Build of Boat Docking Facilities at Singapore Zoo, Mandai Road, Singapore | Singapore Zoological Gardens | Jan-2008 |
120 | Supply and Delivery of Floating Pontoon for Fireworks Performance for Year 2007 Countdown at Marina Bay, Singapore | Glorious Singapore Pte Ltd | Dec-2007 |
121 | Design and Build of Floating Pontoon for Marina at Tanjung Pengelih for Jabatan Laut Wilayah (Police Coast Guard), Kota Tinggi, Johore, Malaysia | Pembinaan Ismail Sdn Bhd | Nov-2007 |
122 | Design and Construction of Floating Bridge at Siloso Beach, Sentosa, Singapore | Sentosa Development Corp | Oct-2007 |
123 | Marine Bored Piles with RCD Rigs of 69 Piles for Mooring System at Keppel Bay Marina, Singapore | Keppel Bay Pte Ltd | Sep-2007 |
124 | Design and Construction of Jetty and Ferry Terminal for Sea Sports Centre at Siloso Beach Walk, Sentosa | Sentosa Development Corp | Sep-2007 |
125 | Supply and Installation of Floating Pontoon for One○ 15 Marina, Phase II including Marine Piling, RC Ramp, M&E & Associated Works, Sentosa, Singapore | SUTL Marina Development Pte Ltd | Jul-2007 |
126 | Design, Supply and Installation of Floating Pontoon at Pulau Renget for Singapore Tourism Board, Singapore | Van Oord Singapore | May-2007 |
127 | Design, Supply and Replacement for 180 Berth Floating Pontoon at Aberdeen, Hong Kong | The Aberdeen Marina Club (Shangri-La Intl Group) |
May-2007 |
128 | Design, Supply and Installation of 21 units of Private Berth to Detached Dwelling Houses at Coral Island, Sentosa Cove, Singapore | Ho Bee (Sentosa) Pte Ltd | Apr-2007 |
129 | Supply and Delivery of Floating Pontoon System and Accessories for Phase III at Telaga Harbour Marina, Telaga Harbour Park, Langkawi, Malaysia | Miru Construction | Mar-2007 |
130 | Installation of 132 Marine Bored Piles for Proposed Extension and upgrading of J12 Berth at Jurong Port, Singapore | Koon Construction & Transport Co Pte Ltd | Dec-2006 |
131 | Retaining Wall made of 1m Dia Bored Piles with RCD Rig at Changi Point Ferry Terminal, Change Village, Singapore | Urban Redevelopment Authority (URA) | Nov-2006 |
132 | Residential Development of Private Berths at The Berth and the Terrace Houses at Ocean Drive, Sentosa Cove, Singapore | Ho Bee Investment Ltd | Oct-2006 |
133 | Supply and Installation of 40-Berth Marina at Kampung Sungai Tekek at Pulau Tioman, Pahang, Malaysia | Katah Realty sdn Bhd | Sep-2006 |
134 | Re-construction of Megayacht Pier for 8 Berths, Tuas, Singapore | Raffles Marina | Apr-2006 |
135 | Supply and Installation of 30-Berth Marina at Tanjong Gemok, Rompin for Jabatan Kerja Raya, Pahang, Malaysia | Tropical Interest Sdn Bhd | Apr-2006 |
136 | Design and Construction of 183-Berth New Marina including Clearing of Marina Basin, Dredging Works, Revetment, Repair Works and Marina Piling at Pulau Rebak Besar, Langkawi, Malaysia | Rebak Island Marina | Mar-2006 |
137 | Sheet Pile Repair at Kranji Sluiceway, Singapore | Publice Utilities Board | Dec-2005 |
138 | Design and Build 50-Berth Marina in time to Host for the Monsoon Cup Regetta from 29 Nov to 04 Dec 2005, Kuala Terengganu, Malaysia | Subur Ehsan Sdn Bhd | Nov-2005 |
139 | Reconstruction and Extension of 90-Berth Marina after Tsunami for Langkawi Development Authority (LADA) at Telaga Harbour Marina, Langkawi, Malaysia | Alam Langkawi Sdn Bhd | Nov-2005 |
140 | Supply and Installation of Launching Pontoons, Boat Control Pontoon including all Mooring System at Watersports Facilities at Precinct 6, Putrajaya, Selangor, Malaysia | Pembinaan Mitrajaya Sdn Bhd | Oct-2005 |
141 | Marine Bored Piles woth RCD Rig and Structural Works on Existing Dolphines and Jettis including drydock 3 Units of Steel Pontoons and Reinstatement at Subar Laut, Subar Darat and Pulau Hantu Kechil, Singapore | Sentosa Development Corporation | Oct-2005 |
142 | Marine Bored Piles with RCD Rig of 75 Piles, including RC Ramp 60m x 6m to -1.00 CD and Mooring System for One○ 15 Marina, Sentosa, Singapore | SUTL Corporateion Limited | Sep-2005 |
143 | Design and Build of 60-Berth Marina at Tanah Merah Coast Road, Changi, Singapore | SAF Yacht Club | Apr-2005 |
144 | Repair Works (Pressure Grout) to RC Underdeck at M1 & M2, Marina Wharves, Tanjong Pagar, Singapore | PSA Corporation Limited | Jan-2005 |
145 | Supply and Drive Steel Pipe Piles and Installation of Floating Pontoon for Police Coast Guard at Loyang Sub-Base, Singapore | San Choon Builders Pte Ltd | Dec-2004 |
146 | Supply and Installation of Floating Pontoon at Changi Naval Base, Singapore | Defence Science & Technology Agency | May-2004 |
147 | Design and Build Heavy-Duty Floating Pontoon for Landing Crafts including Marine Piling of 20 Pipe Piles at Tuas Naval Base, Singapore | Defence Science & Technology Agency | May-2004 |
148 | Design and Build for Demolition of Existing Jetty and Construction of new RC Jetty of 120m Length with Floating Pontoon at Camp II, Pulau Ubin, Singapore | Outward Bound Singapore | Mar-2004 |
149 | Design and Construct Seaward Infrastructure Facilities (Phase I) at Southern Island, Singapore | Defence Science & Technology Agency | Nov-2003 |
150 | Design and Installation of Pontoons and Accessories for 100-Berth Marina at Marina Park Development, Miri, Sarawak, East Malaysia | Pantai Bayu Indah Sdn Bdn | Oct-2003 |
151 | Design and Build of Fuel Pontoon at Pantai Kok, Langkawi, Malaysia | Petronas Dagangan Bhd | Aug-2003 |
152 | Supply and Installation of Megayacht Pontoon at Kota Kuala Kedah, Malaysia | BF Infra Sdn Bhd | Jun-2003 |
153 | Construction of Offshore Structural System to Boardwalk of Western Coastline for Urban Redevelopment Authority at Changi Point, Singapore | Chye Joo Construction Pte Ltd | May-2003 |
154 | Design and Build of 70-Berth Marina inclusive of 7 Megayacht Berth for Harbour Park Marina at Pantai Kok, Langkawi, Malaysia | Maju Holdings Sdn Bhd | Apr-2003 |
155 | Supply and Installation of Ferry Pontoon at Pulau Jerejak,Penang, Malaysia | Tropical Island Resort | Mar-2003 |
156 | Demolition and Replacement of Damaged Dolphin and Guide Piles at Subar Laut and Pulau Hantu Kechil Jetties, Singapore | Sentosa Development Corporation | Jan-2003 |
157 | Proposed Construction of Breakwater and Light Craft Pontoon at National Sailing Centre, East Coast Parkway, Singapore | Singapore Sports Council | Jan-2003 |
158 | Design and Build 40-Berth Marina including Floating Wave Attenuator for Jabatan Kerja Raya ( J.K.R.) at Utara Batu Uban, Penang, Malaysia | Pembinaan Ismail Sdn Bhd | Dec-2002 |
159 | Construction of 10m Slipway Extension at Commando Jetty and Supply and Installation of Floating Pontoon at Hendon Camp for DSTA, Singapore | Prelim Construction Pte Ltd | Dec-2002 |
160 | Suppli, Fabrication; Delivery and Installation of Pontoons, Gangways and Mooring System in Canal, Sentosa Cove | Sentosa Development Corporation (SDC) | Aug-2002 |
161 | Design, Supply and Installation of Floating Pontoon for National Police Cadet Corps at Pulau Ubin, Singapore | Kay Lim Construction & Trading Pte Ltd | Aug-2002 |
162 | Design and Build of Pontoons and Ancillary Works at St. John Island, Singapore | Defence Science & Technology Agency | Jun-2002 |
163 | Upgrading of 2 Jetties at Sultan Shoal Island and Raffles Lighthouse at Pulau Satumu, Singapore | Maritime Port Authority of Singapore | Aug-2001 |
164 | Design and Build for Extension of Phase II Marina of 152-Berth for Royal Langkawi Yacht Club, Langkawi, Malaysia | Baltimore Construction Sdn Bhd | Jul-2001 |
165 | Supply and Installation of Floating Pontoon at Precinct 8 for Perbadanan Putrajaya at KLCC, Selangor, Malaysia | Hartasuma Sdn Bhd | Jul-2001 |
166 | Design and Build Contract of Jetty including Repair Works on RC Structures in Financial Center at Ferderal Territory for Labuan Development Authority, Labuan, Malaysia | Perspective Prime Sdn Bhd | Mar-2001 |
167 | Supply & Installation of Floating Pontoon for Republic of Singapore Navy at Changi Naval Base, Singapore | Koon Construction Pte Ltd | Feb-2001 |
168 | Relocation of Existing Pontoon including Marine Piling from Kallang Headquarters to Lim Chu Kang Regional Base, Singapore | Police Coast Guard | Feb-2000 |
169 | Construction of Floating Pontoon for Lim Chu Kang and Seletar Bases, Singapore | Police Coast Guard | Jan-2000 |
170 | Supply and Installation of Floating Pontoon for 30m Ferry | Ubin Lagoon Resort | Apr-1999 |
171 | Construction Works of Floating Pontoon, RC Jetty, Repair Works and Extension of Existing RC Camp at Pulau Ubin, Singapore | Outward Bound Singapore | Oct-1998 |
172 | Design and Build Contract for 30 Berth Patrol Boats for Police Coast Guard, Gul Basin, Singapore | Salcon Ltd | Sep-1998 |
173 | Design and Build 40-Berth Marina in SAF Sembawang Camp, Singapore | Singapore Armed Forces Yacht Club | Apr-1998 |
174 | Design and Build 20 Berths for 50/80 ft Patrol Boat at Kallang Base, Singapore | Police Coast Guard Headquarter | Mar-1998 |
175 | Design and Build of a 250m Long Floating Breakwater, Phuket, Thailand | The Yacht Haven | Nov-1997 |
176 | Design and Build of 40 Floating Berths Ranging from 12 to 20m for Lumut Internation Yacht Club, Perak, Malaysia | Johan Holdings Sdn Bhd | Sep-1997 |
177 | Design and Build of a Floating Jetty Phase I and Phase II for 90 Ton Ferry, Lumut, Perak, Malaysia | Damai Laut Golf Resort Sdn Bhd | Jul-1997 |
178 | Awarded Phase II for 60 Private Berths, 6 Megayacht Berths and Fuel & Ferry Jetty, Johore, Malaysia | Sebana Cove Marina | Jul-1997 |
179 | Design and Build of Floating Pontoon for 1 Megayacht and 10 Berths, Santubong Kuching, Malaysia | Private Owner | May-1997 |
180 | Design and Build of 300 berths marina from 12m to 55m Phase I and two Concrete Wharves of 40m x 5m for Phase II, Phuket, Thailand. | The Yacht Haven | Apr-1997 |
181 | Supply and Installation of Floating Pontoon at Poly Marina, Singapore | Singapore Polytechnic | Nov-1996 |
182 | Design and Build of 45 Wet Berths Ranging from 12m to 50m for Royal Langkawi Yacht Club, Langkawi, Malaysia | Nilam Timur Sdn Bhd | Feb-1996 |
183 | Supply and Fitting of 70 Wet Berths including 4 Megayachts (up to 50m) | Ponggol Marina Pte Ltd | Nov-1995 |
184 | Design and Build of Ferry Jetty at Umbai Jetty, Malacca, Malaysia | Pulau Besar Sdn Bhd | Jul-1995 |
185 | Supply and Fitting of 300 Berths Phase I Ranging from 12m to 25m, inclusive of Piling, Services, Johore, Malaysia | Sebana Cove Marina | Jul-1994 |