CONSTRUCTION OF 15,000 DWT FEEDSTOCK JETTY AT TUAS POWER

Country:   Singapore

Client:  Tuas Power Ltd

Start date:  October 2009

End date:  April 2010

Scope:  Installation of 63 steel piles
200m long Trestle
600m2 Loading Platform
2 x Breasting Dolphins
4 x Mooring Dolphins
4 x steel walkways

Challenges:  Access to site from sea
Proximity with operational Oil  & Gas terminal
Tight schedule – 6 months 
Large off-shore casting ops