EXTENSION OF BERTH J12 AT JURONG PORT
Country: Singapore
Client: Jurong Port Ltd
Main contractor: Koon Construction
Start date: October 2007
End date: February 2008
Scope: Installation of 140 concrete spun piles
Drill & grout method with Pile-top Reverse
circulation Drill (RCD)
Static load test to 1,000ton
Challenges: Drilling through existing sandkey
Grade IV rock