CONSTRUCTION OF 15,000 DWT FEEDSTOCK JETTY AT TUAS POWER
Country: Singapore
Client: Tuas power Ltd
Start date: October 2009
End date: April 2010
Scope: Design and Build 100m sea barrier with gate
Installation of 63 steel piles
200m long Trestle 600m
2 Loading Platform
2 x Breasting Dolphins
4 x Mooring Dolphins 4 x steel walkways
Challenges: Access to site from sea
Proximity with operational Oil & Gas terminal
Tight schedule – 6 months
Large off-shore casting ops