CONSTRUCTION OF PEDESTRIAN BRIDGE (JUBILEE BRIDGE) AT MARINA BAY

Client:  Urban Redevelopment Authority (URA)
Start date:  November 2012
End date:  April 2015

Scope:  12 x 1200mm marine bored piles
Installation of 2 x cofferdam
Casting and erection of 61 nos Precast segment
2000m3 of reinforced concrete
500ton of steel reinforcement
Post tensioning
Architectural finishes

Challenges: Difficult geometry requiring high precision during casting and erection.
100m long center span.
Site located in the heart of the City